EN
Press-centre

TAMAK in Austria

16.08.2017
On 16 August 2017, the pre-fabricated set of the panel timber frame demonstration house TAMAK was delivered to the construction site in Austria.
TAMAK in Austria

On 11 August 2017, the trucks with the house set for mounting of the first panel timber frame demonstration house TAMAK in Austria departed from the factory gate. The trucks had travelled for more than 3000 km and came to the city of Linz at 8.45 a.m. local time on 16 August. The assembling of the house is to start on 16 August in the Austrian exposition centre Musterhauspark, where houses manufactured by German and Italian companies are presented. The mounting process is directed by Klaus Steiner, TAMAKs consulting specialist in technical development and export.

You are welcome to come and see the process of house assembling.

Rambler's Top100 Rambler's Top100